
AE-23A-wBS
Original price was: $334.80.$234.36Current price is: $234.36.
Vivotek – AE-23A-wBS – Side-Opening AC24V Cast Aluminum Camera Housing, AC24V input
- Weatherproof IP68-rated Enclosure without Wiper
- Vandal-proof IK10-rated Cast Aluminum Housing
- Window Demister Heater and Fan
- Adjustable Sun shield
- Side-Opening Alarm Switch
- VAIR Illuminators (Optional)
- Description
- Product Resources
- Additional Information
- Collsam Brands
- Reviews
Description
The Vivotek AE-23A-wBS is the perfect solution for protecting your valuable surveillance cameras in outdoor environments. Cast aluminum makes this outdoor enclosure ideal for use in various outdoor settings. With its IP68 rating, it keeps dust and water out of the enclosure, keeping your cameras safe and working well.
The IK10 vandal proof rating on this outside enclosure adds an extra layer of protection against damage and tampering. This makes it an excellent choice for high-risk areas where cameras may be subject to intentional damage. The Vivotek AE-23A-wBS keeps your surveillance equipment safe and functional, giving you peace of mind and reliable performance.
Any surveillance system can use the Vivotek AE-23A-wBS because it can hold different cameras. It supports 24VAC/28VDC input, allowing for a wide range of compatibility with different camera models and power sources. The box has a heater and fan to control the temperature inside, so your cameras work well all the time.
For added convenience, the Vivotek AE-23A-wBS features an adjustable sun shield to protect your cameras from harsh sunlight and glare. This helps to maintain a clear and unobstructed view, ensuring that your surveillance footage is always of the highest quality. The box has a switch on the side that opens to let you check on your cameras and resolve problems.
The AE-23A-wBS also comes with a VAIR (Vari-Angle IR) illuminator. This feature ensures that your cameras capture clear and detailed footage, even in dim lighting, to ensure 24-hour surveillance coverage. With this feature, you can ensure that your cameras capture clear and detailed footage even in low light conditions. Overall, the Vivotek AE-23A-wBS is a reliable and versatile outdoor enclosure that is designed to provide superior protection for your valuable surveillance cameras, making it an essential component of any outdoor surveillance system.
Additional information
| Weight | 8 lbs |
|---|---|
| Dimensions | 22 × 8 × 8 in |
Brand
Vivotek
VIVOTEK provides professional IP video solutions for commercial, enterprise, and smart-city applications. Network security cameras provide reliable monitoring, while video surveillance software supports centralized system management.
Network video recorders provide dependable recording and storage, and PoE network switches support power and network connectivity for compatible surveillance devices.
VIVOTEK solutions combine intelligent video technology with flexible network infrastructure. Network security cameras support different monitoring requirements.
Video surveillance software helps security teams manage cameras, events, and recorded video. Network video recorders help maintain surveillance footage, while PoE network switches simplify compatible IP installations.
Collsam Security provides VIVOTEK products for new installations, upgrades, and system expansion. Available cameras, recorders, networking products, software, mounting hardware, and accessories support dependable professional surveillance systems.
These solutions provide flexible options for businesses, campuses, public facilities, commercial properties, and other locations requiring reliable video security, network connectivity, recording, monitoring, and intelligent system management.
Only logged in customers who have purchased this product may leave a review.

























Reviews
There are no reviews yet.