AE-238-wBS
Original price was: $269.99.$176.95Current price is: $176.95.
Vivotek AE-238-wBS Side-Opening Cast Aluminum Camera Housing, AC24V input
- Supporters All VIVOTEK Box Cameras
- 24VAC/VDC Input Voltage
- 30W Max Output Power Budget
- Power Consumption: Window Heater: 10W, Blower: 2W, Camera: 6 ~ 8W, Others: 2W
- Operating Temperature: -4 °F (-20 °C) ~ 149 °F (65 °C)
- Windows Heater ON/OFF: ≤ 86 °F (30 °C) ON, ≥ 95 °F (35 °C) OFF
- Fan ON/OFF: ≥ 104 °F (40 °C) ON, ≤ 95 °F (35 °C) OFF
- IP68 Ingress Protection
- IK10 Vandal Proof
- Aluminum Material
- Description
- Attachment
- Specifications
- Additional information
- Reviews (0)
Description
Introducing the Vivotek AE-238-wBS outdoor enclosures – the perfect solution for protecting your Vivotek box cameras in outdoor environments. Designed to be compatible with all Vivotek box cameras, including those with wide-angle or long-distance remote focus lenses, these enclosures are the ultimate choice for ensuring the safety and longevity of your cameras.
Constructed from high-quality cast aluminum, these enclosures are built to withstand even the toughest outdoor conditions. With an impressive IP68 rating, they are fully waterproof and dustproof, providing complete protection from the elements. Additionally, they meet IK10 standards for impact resistance, making them durable and able to withstand physical attacks.
The Vivotek AE-238-wBS outdoor enclosures are a reliable choice for any outdoor surveillance needs, offering both durability and functionality. With their sleek and modern design, they not only provide protection, but also enhance the aesthetics of your camera setup. The enclosures also come equipped with a built-in heater and blower system, ensuring that your cameras can continue to operate in extreme temperatures and harsh weather conditions.
In addition to their physical features, these enclosures also offer easy installation and maintenance. A simple and user-friendly design allows for effortless setup, while the quick-release latch mechanism provides easy access to the camera for maintenance and adjustments. This means that you can spend more time focusing on your surveillance requires, rather than worrying about complicated installations or maintenance.
Don’t risk the safety and functionality of your outdoor surveillance cameras. Choose the Vivotek AE-238-wBS outdoor enclosures for the ultimate protection and peace of mind. With their compatibility, durability, and user-friendly features, they are the perfect choice for any outdoor surveillance needs. Invest in the Vivotek AE-238-wBS outdoor enclosures and ensure the safety and longevity of your cameras today.
| Input Voltage | 24VAC/VDC |
| Power Output | AC/DC 24V×1 DC 12Vx1 |
| Max Output Power Budget | 30W |
| Power Consumption | Window Heater: 10W Fan: 2W Others: 2W |
| Operating Temperature | -4 °F (-20 °C) ~ 149 °F (65 °C) |
| Windows Heater ON/OFF | ≤ 86 °F (30 °C) ON ≥ 95 °F (35 °C) OFF |
| Fan ON/OFF | ≥ 104 °F (40 °C) ON ≤ 95 °F (35 °C) OFF |
| Waterproof IP Rating | IP68 Ingress Protection |
| Vandal Proof | IK10 Impact Rated on Cast Aluminum Housing |
| Supported Cameras | All VIVOTEK Box Cameras |
| Included Accessories | Installation Guide Screw Kit Wall Mount Bracket (AM-21E) Sun Shield (AE-2S1) |
| Mount Type | Wall Mount Ceiling Mount Corner Mount Standing Mount |
Additional information
| Weight | 6 lbs |
|---|---|
| Dimensions | 18 × 8 × 14 in |
Only logged in customers who have purchased this product may leave a review.




























Reviews
There are no reviews yet.